← Back to Skypath Simulator
HERMES — Phase 5 Integration Test
Drives the 9-step command sequence against HERMES and verifies each decision, dispatch outcome, and the HOLD / resume lifecycle.
| Case | Expected | Actual | Disp. | Result |
|---|---|---|---|---|
| No run yet. Click “Run Integration Test”. | ||||
Mission Log (0)
Log is empty.
The panel reflects live session state. After case 7 it enters a HOLD (amber, dispatch locked); after case 9 it returns to APPROVED (green).